SOLAR SIMMICRONETICA / ALPHA 02
ALLOY78
SILICA82
COPPER72
GRID EXPORT0.00 kW
CLEAR SKIES0 W/m²
DAY 0108:30
SITE 01 / SOLAR RANGE

Helios Basin

FIELD OPERATIONS 72 × 72 SURVEY GRID
HELIOS BASIN / OPERATIONS MANUAL

Field guide

● DC string / feeder● MV feeder● Auxiliary AC● Heat pipe
  1. Wire a PV string. Place 12–24 modules. Use DC cable and click successive modules in series, upstream to downstream. Connect the last module to a DC combiner. Use the same string length on each combiner and at a shared inverter input.
  2. Protect and export. Each combiner takes 10 strings with separate monitored fuses and an output switch. Connect the combiner to the transformation centre with a DC feeder. Use MV cable for the centre → protection cell → main network.
  3. Add storage. A battery includes a bidirectional PCS and step-up transformer. Connect it to the main network through its own MV cell. It charges from solar surplus and can support the site or export at night.
  4. Operate the site. Right-click a deposit with a worker selected to recover materials. Build and cable a worker factory to grow the fleet. At 22% the tracked worker seeks a powered pad or parks and uses its roof panel to recharge.
  5. Build a thermal circuit. Pipe flat-plate collectors to a heat store. Pipe troughs and towers to a turbine, then use an auxiliary AC cable to connect the turbine to the operations hub.

Left-click to select or build. Drag with the left mouse button to pan or the middle button to rotate. Scroll to zoom. Click the minimap to jump. Esc clears the current tool. Space pauses.

HELIOS BASIN / ELECTRICAL OPERATIONS

Equipment details

MICRONETICA / INTERACTIVE SYSTEMS

SOLAR SIM

Surveying Helios Basin…

FIELD BUILD 0.2.0